The timber deck and bench of the Cervia pavilion, looking out over the white salt pans

Nine days in the salt pans

Date
18 September 2022
Topic
Site notes
Length
1 min read

The salt pans can only be worked between the end of the harvest and the first autumn rain. That gave us nine days.

No steel

Salt eats steel. Every joint in the pavilion is timber on timber, held with oak pegs that the carpenters cut on site from a single beam.

The last day

We fixed the final roof board at six in the evening, as the first clouds came in from the sea. It rained for a week. The pavilion has been dry underneath ever since.